The basement of a country house – one of his major premises. In a country house it can be used for technical needs – the garage, boiler room, water meter unit, Laundry facilities. Or for leisure, placing in a swimming pool, billiard room, sauna, gym, wine cellar, workshop and other auxiliary premises (storage rooms, etc.), which you would not like to see in the first or higher floors of a cottage or a bath. See below to learn more about Replacing steel frame basement windows

In the basement repair the machines and keep them in garden tools, different technique. In the basement you can put a heat pump, ventilation equipment, water pump, Central vacuum and other equipment smart home. When building your own home, few who can avoid the temptation to do a basement conversion. Browse some photo of Replacing steel frame basement windows

The height of the basement: technical premises take from 1.9 to 2.2 m. If you are going to do from the basement of a dwelling, the height may be equal to the height of the floor or just below (2,5-2,7 m). At the close inception of the groundwater to the ground surface basement need to build from solid reinforced concrete (floor, walls). It is better to take concrete below grade M500 (or make concrete using cement grade M500).

Projects of single-storey houses with a basement or without, as well as options for two and even three floors offered today by designers for private construction, are so diverse that the decision can be difficult. But the specific option is not always depends on the willingness of the customer, not even limited by a strict budget. We have to reckon with the climate area, where will be construction, the geological characteristics of the soil in the area, and topography of the site.

The construction of the basement under the house requires additional labor and increases the consumption of materials. Therefore it is necessary to comprehensively consider options for the installation of foundations to reduce cost without loss of reliability and durability of the structure. Types of foundations: pile Foundation, raft Foundation, strip Foundation.

Because excavation for construction of the Foundation is a very time consuming job, mostly used excavator. Before excavation it is desirable to remove the useful layer of soil. Ditch digging 30 cm more than the approved size of the Foundation. Part of the ground will be useful for back filling, so no need to take out all the soil excavated from the pit from the site. The bottom of the pit and rams.

The device basement waterproofing involves protection of buildings outside and inside. However, it is not always possible to perform the waterproofing work on time and in full. And, as experience shows, to do them later is much more expensive and complicated. Depending on the plot, select vertical and horizontal waterproofing.

The most reliable will be a monolithic wall. They still at the stage of creating the armature plate make the vertical reinforcement bars: outer – length 1.5-1.7 m, inner 1.2-1.3 m. When the base plate attains 70% of its strength, continue to knit the reinforcing frame in accordance with the project. Reinforced inner and the outer walls serve as ribs for slab Foundation. Height of basement walls may be different, depending on the destination premises.

Perimeter walls the best way to do solid, and the reinforcement of basement walls will be the key to his long life. Don’t forget that fittings must be laid before pouring the basement floor. I should add that the reinforcement must be done, regardless of the thickness of the future walls. As reinforcement best suited to the 12 mm rods, the first row which must be mounted in 5-7 cm from the soil surface. The greatest strength of the wall will give a double reinforcing mesh. The size of each cell should not exceed 40×40 cm.

The purpose of external drainage, the redirection of groundwater. There are two possible variant of the device of drainage path: drainage wall and ring. The first is built next to the Foundation walls with old houses is unacceptable, as it threatens the destruction of their base.

The working principle of natural ventilation is based on the difference in temperature inside and outside of the basement, resulting in starts the movement of air. Thanks to this simple natural phenomenon, the air from the cellar in the sky, on the street, and the street comes fresh. Unfortunately, the thrust is sufficient natural ventilation is strongly influenced by the wind that would both enhance, and weaken the appetite.

Insulation of basement walls on the outside is best done at the stage of building a house — when the Foundation is laid, made waterproofing, but has not yet filled his sinuses. If a private home operated, the amount of work increases significantly. First, it is necessary to dig a basement is to dig a perimeter trench of a house off the Foundation to the very bottom.

An important factor to determine the heating of the basement, you choose, will be the purpose of the room. If you plan to equip in the basement of the dwelling, will need full heating, so the heat was even in the terrible cold. Here are the relevant options of steam heating, gas boiler, if this involves designing. Read related articles on the subject of Replacing steel frame basement windows

If you decide to build it all yourself, then be sure to get support. Even the trite advice of neighbors who have already made the cellars in their houses and know all about the level of groundwater and the terrain. When possible, the construction of the basement must be done, by hiring professionals.